Find Roll Forming Machine, Hydraulic Decoiler, Hydraulic Type Uncoiler Machine on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Home > Products > Roll Forming Machine > C-Z quick interchangeable purlin rolling forming machine

C-Z quick interchangeable purlin rolling forming machine

Place of Origin: 
China
Supply Ability: 
100sets/Year
Certificate: 
CE, RoHS, SGS, GS

Basic Info

Model No.:  C to Z forming machine

Product Description

Model NO.: C to Z forming machine Certification: CE, RoHS, SGS, GS Condition: New Automatic Grade: Semi-Automatic Trademark: HYMT Origin: China Warranty: 2 Years Customized: Customized Control Type: Artificial control voltage: 24V Specification: thickness: 0.3-1mm HS Code: 847480100 I Description    (above as similar photo, only for reference)
C-Z quick interchangeable machine adopts a special structure. The rollers for C & Z are changed very quickly without dismantle any parts. One machine can produce all specifications of C & Z purlins. Crimples are optional to increase rigidity of purlin.
II Main technical data:
Main dimension: Main dimension: 11400 x 1600 x 1800mm
otal weight: otal weight: 14000kg
Hydraulic pressure 15-20MPa
Steps of rollers: Feeding & guiding: two sets
   

Leveling: one set, seven rollers
   Main forming rollers: 17 steps
   Rib making: one step
   Rectifying: one step
2.7 Forming speed: 10-12 m/min
2.8 Changing speed from one profile to another or from one size to another size: 15 minutes.
2.9 Purlin specifications:
   For C purlin: 140-170mm
   For Z purlin: 140-170mm
2.10 Suitable material: 1-3.0mm, Q195~235 cold rolled steel, hot-zinc coil
2.11 Punching station: one station
2.12 Material of rollers: GCr15, 9CrSi, quenched
2.13 Material of rib roller: GCr15, 40Cr, quenched
2.14 Shape of rib: slash rib
III :profile of the C and Z
Pls check below drawing, if can not meet your demand, so pls send yourdarwing

Buildup of the line
Mechanical decoiler,
feeding & leveling device
pre-cutting device
pre-punching device
main forming unit
PLC control system: Japan, Panasonic
hydraulic station
unloading rack.

Our services:
1.Standardization of Service "212"
2: response in 2 hours
1: provide solution in 1 day
2: solve complaint in 2 days
2.Installation Service
Installation Services are available with all HYMT machines. We dispatch technician to customer's 
factory for installation and preoperation of machines.
3.Training Service
Our technician is available to your factory and offer training of how to use our machines. As well, you
 may send your technician to our company to learn how to operate machines.
4.Quality Guarantee
We guarantee the quality of machine (e.g. processing speed and working performance is the same as 
the data of samples making). We sign the agreement with detailed technical data.
We arrange final test before shipment. We run the machine for a few days, and then use customer's 
materials for test. After making sure machine is the best performance, then make shipments.
 

Contact us if you need more details on metal forming machine. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Roll Forming Machine、roof forming machine. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Roll Forming Machine